Analysis of the preliminary safety case report for the channel tunnel fixed link
Analyse du rapport global préliminaire de sécurité de la liaison fixe transmanche
Abstract
In the beginning of 1991, after a number of discussions with the Intergovernmental Commission (IGC) for the Channel Tunnel and the Safety Authority (SA), it was decided that EUROTUNNEL (ET) would carry out a general study of the transport System to use the Channel Tunnel Fixed Link. The basis for this said report was to be drawn from the results of the Avant-Projets already submitted to the IGC, from the existing Safety Reports and from a Quantified Risk Assessment as well as from Risk Criteria. The final version of the Safety Case Report aims to present a comprehensive assessment of the design and operational safety of the Channel Tunnel Fixed Link, taking into account identified hazards and related risk quantification.
Origin : Files produced by the author(s)