Analysis of the preliminary safety case report for the channel tunnel fixed link - Ineris - Institut national de l'environnement industriel et des risques Accéder directement au contenu
Communication Dans Un Congrès Année : 1993

Analysis of the preliminary safety case report for the channel tunnel fixed link

Analyse du rapport global préliminaire de sécurité de la liaison fixe transmanche

Résumé

In the beginning of 1991, after a number of discussions with the Intergovernmental Commission (IGC) for the Channel Tunnel and the Safety Authority (SA), it was decided that EUROTUNNEL (ET) would carry out a general study of the transport System to use the Channel Tunnel Fixed Link. The basis for this said report was to be drawn from the results of the Avant-Projets already submitted to the IGC, from the existing Safety Reports and from a Quantified Risk Assessment as well as from Risk Criteria. The final version of the Safety Case Report aims to present a comprehensive assessment of the design and operational safety of the Channel Tunnel Fixed Link, taking into account identified hazards and related risk quantification.
Fichier principal
Vignette du fichier
1993-004_hal.pdf (717.33 Ko) Télécharger le fichier
Origine : Fichiers produits par l'(les) auteur(s)

Dates et versions

ineris-00971855 , version 1 (03-04-2014)

Identifiants

  • HAL Id : ineris-00971855 , version 1
  • INERIS : PU-1993-004

Citer

Jean-Philippe Pineau, Françoise Abiven, F. Morin, M. Alonso. Analysis of the preliminary safety case report for the channel tunnel fixed link. ESReDA seminar "Safety in transport systems", Apr 1993, Huddersfield, United Kingdom. pp.199-211. ⟨ineris-00971855⟩

Collections

INERIS
63 Consultations
2511 Téléchargements

Partager

Gmail Facebook X LinkedIn More